Fuel systems · Fuel systems contractor, for a data centre operator
Pump room control panels for a 17-generator data centre fuel system
A UK fuel systems contractor was installing the generator fuel system for a data centre campus: 17 standby generators, four underground bulk tanks, two pump rooms, a fill point and a dump tank. We designed, built and programmed the control panels.
- Customer
- Fuel systems contractor
- Panels
- Pump room, changeover and fill point PLC panels
- Site
- Data centre campus, 17 generators
- Control
- Siemens S7-1200 on an MRP ring
- Software
- PLC and HMI written by G&G
The challenge
Fuel for 17 standby generators on a data centre campus, from four bulk tanks through two pump rooms, with either room able to carry the site alone.
What we supplied
Seven panels: a PLC panel for each pump room, four supply changeover panels and a fill point PLC panel, on a Siemens ring network.
The result
Despatched in batches over five weeks, with the PLC and HMI software written by us. Our fourth generator fuel system for the same contractor since 2024.
The requirement
Keep the day tanks of 17 standby generators full from four underground bulk tanks, on HVO fuel. The contractor had replaced the pressurised ring main in the original specification with a low-pressure system that runs only on demand, to keep the risk of a leak down: submersible lift pumps and booster pumps start when the generators call for fuel, one pump serves up to nine generators, and a second starts beyond that. If a pump does not prove flow within ten seconds, the next one takes over. A generator fire dumps that generator's fuel by gravity to a dump tank, which pumps itself back to the bulk tanks once it passes 85%. The controls had to make all of that work, and keep working if either pump room is lost.
The constraints
- Two pump rooms, with control handed to the other room if one has a fire.
- Pumps fed through changeover panels, so either pump room's supply can run them and one room can be isolated.
- Generators across several floors of generator garages, each shown on the door, with every pump and motorised valve controllable by hand if needed.
- A design that changed as the contractor and the consultant worked through it: the pump room drawing set reached revision 13, the last change adding valve control from two locations.
What we built
A floor-standing PLC panel for each pump room, with Siemens S7-1200 controllers on a Siemens media redundancy (MRP) ring network, a touchscreen HMI and a full mimic on the door: generator demand lamps floor by floor, running, flow proved and fault lamps with hand/off/auto for each pump, open and closed lamps with open/close/auto for each motorised valve, and fire, emergency stop and supply healthy indication. Four changeover panels feed the bulk tank pumps from either pump room's supply. A fill point PLC panel runs the tanker fill point and the four bulk tank return valves, with common leakage indication. We wrote the PLC and HMI software.
Delivery
The seven panels left Stoke-on-Trent in batches between mid-March and mid-April 2026, each with its drawings and test certificate.
The outcome
A fuel system whose controls were designed, built and programmed by one company, and that keeps fuelling the generators with a pump room out of action. It is the fourth generator fuel system we have built for this contractor since 2024, three of them for data centres: before it came a generator compound with duplicated master panels so the fuel system stays concurrently maintainable, and a multi-storey data centre with separate fuel and AdBlue systems across four floors, thirteen panels in all.
Photos
Got a similar job?
Send the spec, points list or drawing and we will tell you what we would build, the price and the date.
“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”
- Wiring diagram, test certificate and 12-month warranty with every panel
- Built to BS EN 61439 and BS EN 60204-1 in Stoke-on-Trent
- We reply during working hours, usually the same working day
More case studies

Butlins Skegness
One MCCP for 64 motors in a water park plant room
The pool and water park plant room at Butlins Skegness needed a new MCCP to run every pump, blower and feature from one place, with a BMS interface for the integrator's controllers. We designed and built it in Stoke-on-Trent.
Read the case study
Confidential London project
Every BMS control panel for a prestigious London building, from one supplier
The full BMS control panel supply package for a high-profile London building: every outstation and motor control panel across its plant rooms, designed, built and tested in Stoke-on-Trent and delivered to the contractor's programme. The client and project cannot be named.
Read the case study
SSE Energy Solutions
A Form 2 outdoor BMS panel on the roof in 12 working days
SSE Energy Solutions were refitting the third floor of Highgate Mental Health Hospital in London: new walls, heating, HVAC, electrical and controls throughout, with a new BMS tying into the trust's existing Trend network. The panel for it had to sit on the roof, and the only crane was coming down in three weeks.
Read the case studyGot a project, or just need a quick answer?
Tell us what the panel has to do and we will come back with a price and a lead time. Existing accounts: reorders and spares go through the same form.