What we built, and what it had to do

Each one covers the brief, what made it hard, the panel we built and what happened on site. Some customers are named with their permission; the rest are described by what they do and roughly where.

Pump control panels

About this sector →
Two Telemetrix control panels installed side by side in a GRP kiosk at a West Sussex County Council landfill site

Pump service contractor, West Sussex

Three Telemetrix panels for West Sussex County Council's landfill pumping stations

The contractor look after the pumping infrastructure at West Sussex County Council's landfill sites under a long-term asset management contract. They fitted three wastewater high-level Telemetrix panels so the council gets live status and alerts, and maintenance can be preventative rather than reactive.

Read the case study
Inside a twin star/delta Telemetrix panel: two full starter groups, the logic module and the router for remote monitoring

Pump specialist, Oxfordshire

A star/delta Telemetrix panel, turned round quickly for an Oxford campus

A pumping station on a university campus in Oxford needed its control panel replaced, along with the pump and the float switches. The pump specialist specified a bespoke star/delta Telemetrix panel with remote monitoring, and the whole job, panel, floats and a new 6kW Sulzer pump, was done in a morning.

Read the case study
Three Telemetrix control panels installed side by side on a brick wall, wired and labelled

Pumping station specialist, South East

Telemetrix as standard across a pump service contractor's stations

The contractor refurbishes and maintains pumping stations across the South East, and now fit Telemetrix as a matter of course: three side by side at one site, four in a single week at others, six and counting. They install them and then monitor them for their clients.

Read the case study
Telemetrix wastewater control panel with remote monitoring built in

Drainage contractor, East Midlands

A care home pumping station rebuilt from the pipework up, with Telemetrix on top

The drainage contractor stripped and rebuilt a care home's pumping station in one job: new pipework, guide rails, pumps, pedestals, chains and grease trap, finished with new Telemetrix panels so the station is monitored around the clock.

Read the case study
A G&G wastewater pump control panel, door closed

Pump maintenance contractor

End-of-life panel replaced at a school, floats included, in one visit

After years of maintaining a school's pumping station and advising that the control panel had reached the end of its serviceable life, the maintenance contractor replaced it with a G&G panel and new float switches in a single visit timed to suit the school.

Read the case study
A Telemetrix control panel mounted on a brick wall

Pump service contractor

An old mill's de-watering station refurbished, with alerts added

A de-watering station under an old mill, reached through a brick culvert, was cleaned out and refurbished from the pumps up. Two new pumps, new floats and a Telemetrix panel mean the next problem is a message rather than a flooded basement.

Read the case study
A Basix panel and a Telemetrix panel side by side

Pump distributor

Out with the old, in with the new: a station upgraded to Telemetrix

The distributor replaced a tired pump control panel with Telemetrix, so the station the engineer had been called out to now tells him when something is wrong.

Read the case study

Plenty of what we build never appears here, including OEM and volume programmes. If you want to hear from someone doing what you are about to do, ask and we will arrange a reference from a customer in your sector.

In their words

“It's everything you'd expect from a G&G panel. It's simple to install and easy to use. I really like the standard in-built light. It's reliable and versatile. When clients want panels on site quick, it's perfect. In short I think it's going to be a game-changer for people in the pump industry.”

Terry Isaac, Director of Operations, pump service contractor, on Telemetrix

“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”

Pump installer, on the Basix range

“The panel is very, very decent. Highly rated so far in terms of installation and setting up.”

Installing engineer, on Telemetrix

“Normally we'd expect a 6 to 8 week lead time on a panel build. In this case it was done in 12 working days, which is a testament to G&G Controls and SSE working together.”

Daniel Lake, SSE Energy Solutions, on a BMS panel

Got a job like one of these?

Send the spec, the pump schedule or the points list and we will tell you what we would build and what it costs.