Case studies
What we built, and what it had to do
Each one covers the brief, what made it hard, the panel we built and what happened on site. Some customers are named with their permission; the rest are described by what they do and roughly where.

Pump service contractor, West Sussex
Three Telemetrix panels for West Sussex County Council's landfill pumping stations
The contractor look after the pumping infrastructure at West Sussex County Council's landfill sites under a long-term asset management contract. They fitted three wastewater high-level Telemetrix panels so the council gets live status and alerts, and maintenance can be preventative rather than reactive.
Read the case study
Fuel systems contractor, for a data centre operator
Pump room control panels for a 17-generator data centre fuel system
A UK fuel systems contractor was installing the generator fuel system for a data centre campus: 17 standby generators, four underground bulk tanks, two pump rooms, a fill point and a dump tank. We designed, built and programmed the control panels.
Read the case study
Pump specialist, Oxfordshire
A star/delta Telemetrix panel, turned round quickly for an Oxford campus
A pumping station on a university campus in Oxford needed its control panel replaced, along with the pump and the float switches. The pump specialist specified a bespoke star/delta Telemetrix panel with remote monitoring, and the whole job, panel, floats and a new 6kW Sulzer pump, was done in a morning.
Read the case study
Butlins Skegness
One MCCP for 64 motors in a water park plant room
The pool and water park plant room at Butlins Skegness needed a new MCCP to run every pump, blower and feature from one place, with a BMS interface for the integrator's controllers. We designed and built it in Stoke-on-Trent.
Read the case study
Pumping station specialist, South East
Telemetrix as standard across a pump service contractor's stations
The contractor refurbishes and maintains pumping stations across the South East, and now fit Telemetrix as a matter of course: three side by side at one site, four in a single week at others, six and counting. They install them and then monitor them for their clients.
Read the case study
Temporary cooling hire company
A dual chiller changeover panel, drawn once and built again and again for a hire fleet
A national cooling hire company sends chillers out in pairs, and every pair needs a changeover panel to share the load, rotate duty and take over when one trips. We took their existing panel design, re-engineered it, drew it as indoor and outdoor standards and now build it whenever their depots need more.
Read the case study
Drainage contractor, East Midlands
A care home pumping station rebuilt from the pipework up, with Telemetrix on top
The drainage contractor stripped and rebuilt a care home's pumping station in one job: new pipework, guide rails, pumps, pedestals, chains and grease trap, finished with new Telemetrix panels so the station is monitored around the clock.
Read the case study
Fuel storage specialist, Yorkshire
Fuel polishing and transfer panels for a site you can't easily get to
A UK fuel storage specialist was supplying a fuel polishing and transfer system for a remote site overseas: polishing units in a pumphouse and in containers, a transfer unit and a monitoring point. We designed, built and programmed all six control panels.
Read the case study
Pump maintenance contractor
End-of-life panel replaced at a school, floats included, in one visit
After years of maintaining a school's pumping station and advising that the control panel had reached the end of its serviceable life, the maintenance contractor replaced it with a G&G panel and new float switches in a single visit timed to suit the school.
Read the case study
Confidential London project
Every BMS control panel for a prestigious London building, from one supplier
The full BMS control panel supply package for a high-profile London building: every outstation and motor control panel across its plant rooms, designed, built and tested in Stoke-on-Trent and delivered to the contractor's programme. The client and project cannot be named.
Read the case study
Pump service contractor
An old mill's de-watering station refurbished, with alerts added
A de-watering station under an old mill, reached through a brick culvert, was cleaned out and refurbished from the pumps up. Two new pumps, new floats and a Telemetrix panel mean the next problem is a message rather than a flooded basement.
Read the case study
Cooling hire company, for a chemical manufacturer
A process cooling panel for a chemical plant, proven at a two-day factory acceptance test
A cooling hire company were supplying a process cooling system to a specialist chemical manufacturer in the South of England: a chiller, an air-blast fluid cooler, process and recirculation pumps and a weir tank. We designed, built and programmed the control panel, and the customer and their client watched it run through a two-day factory acceptance test in Stoke-on-Trent before it left.
Read the case study
Fuel tank manufacturer
From two bespoke panels to a tank manufacturer's own range of fuel panels
A UK fuel tank manufacturer supplies tanks with pump sets for generator day tanks and fuel polishing. We built its first two control panels in early 2026, standardised them, and by October were building a three-panel range to its own product codes.
Read the case study
SSE Energy Solutions
A Form 2 outdoor BMS panel on the roof in 12 working days
SSE Energy Solutions were refitting the third floor of Highgate Mental Health Hospital in London: new walls, heating, HVAC, electrical and controls throughout, with a new BMS tying into the trust's existing Trend network. The panel for it had to sit on the roof, and the only crane was coming down in three weeks.
Read the case study
Pump distributor
Out with the old, in with the new: a station upgraded to Telemetrix
The distributor replaced a tired pump control panel with Telemetrix, so the station the engineer had been called out to now tells him when something is wrong.
Read the case study
Process cooling specialist, West Midlands
Pump skid panels for a process cooling specialist, from a one-off to a repeat
A West Midlands process cooling company build pump skids to go with their chillers. We built them a twin-inverter panel with duty changeover and a chiller interlock, then a simpler single-inverter panel designed to be ordered again. They now reorder it by its drawing number.
Read the case study
Fuel systems integrator
Bulk tank selection and isolation valve panels, repeated depot by depot
A fuel storage and dispensing systems integrator needed a panel to control the selection and isolation valves between a depot's bulk tanks and its loading pumps. We designed the first in 2024 from their control philosophy, and have built it four more times since.
Read the case studyIn their words
“It's everything you'd expect from a G&G panel. It's simple to install and easy to use. I really like the standard in-built light. It's reliable and versatile. When clients want panels on site quick, it's perfect. In short I think it's going to be a game-changer for people in the pump industry.”
“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”
“The panel is very, very decent. Highly rated so far in terms of installation and setting up.”
“Normally we'd expect a 6 to 8 week lead time on a panel build. In this case it was done in 12 working days, which is a testament to G&G Controls and SSE working together.”
Got a job like one of these?
Send the spec, the pump schedule or the points list and we will tell you what we would build and what it costs.