OEM and equipment manufacturers · Process cooling specialist, West Midlands
Pump skid panels for a process cooling specialist, from a one-off to a repeat
A West Midlands process cooling company build pump skids to go with their chillers. We built them a twin-inverter panel with duty changeover and a chiller interlock, then a simpler single-inverter panel designed to be ordered again. They now reorder it by its drawing number.
- Customer
- Process cooling specialist
- Panels
- Single and twin inverter pump panels
- Drives
- Invertek, 2.2kW
- Repeat
- Reordered by drawing number
The challenge
Control panels for a process cooling company's pump skids, with inverter-driven pumps, a chiller interlock and a safe emergency stop.
What we supplied
A twin-inverter panel with duty changeover first, then a simpler single-inverter design priced to repeat.
The result
The single-inverter design was approved within an hour of the drawing landing and has since been reordered by drawing number.
The requirement
Control panels for the pump skids the customer builds alongside their chillers. The first was a twin-pump skid: two 2.2kW pumps, each on its own inverter, with duty changeover, an emergency stop, and a switch to start an external chiller through a volt-free contact, with the chiller's run and fault shown on the door. The next skids needed a single 2.2kW inverter-driven pump started and stopped by the customer's own controls, with two preset speeds selected by volt-free contacts, hand/off/auto on the door and a temperature display for monitoring only.
The constraints
- Pumps on inverters, with the drives fitted in the panel and set up before delivery, so the skid runs when it is wired.
- A safety-rated emergency stop, with the door showing when it is active.
- Simple volt-free interfaces to the customer's chiller and controls, nothing that needed a BMS.
- Indoor, skid-mounted enclosures: compact, with a fan and thermostat to keep the drives cool.
- For the repeat design, a price that made sense to order again and again.
What we built
The twin-pump panel uses two Invertek drives, a Siemens LOGO! with an expansion module for the duty changeover and chiller enable logic, a Pilz safety relay for the emergency stop, interface relays and a door laid out in plates for power, each inverter and the chiller. For the single-pump design we left the PLC out: the two speeds are preset in the Invertek drive's own parameters, a Schneider safety relay handles the emergency stop and three relays do the rest, in a smaller enclosure. We also offered a cheaper route, a wall-mounted IP66 drive with no panel at all. The customer preferred a traditional panel for this job, and we built the panel.
Delivery
The single-pump drawing was approved within an hour of us sending it, and the first two were built and despatched about three weeks later. The third was ordered as a straight repeat of that drawing number, needed no redesign and went out three weeks from the order, works tested at full supply voltage with no faults.
The outcome
A small, repeatable panel the customer can order by drawing number and fit to each skid as it is built. Approving the drawing, the customer replied: "That's perfect … thanks very much. They can be put into production." Six months later the order was one line: a repeat of the same panel.
Photos
Got a similar job?
Send the spec, points list or drawing and we will tell you what we would build, the price and the date.
- Wiring diagram, test certificate and 12-month warranty with every panel
- Built to BS EN 61439 and BS EN 60204-1 in Stoke-on-Trent
- We reply during working hours, usually the same working day
More case studies

Butlins Skegness
One MCCP for 64 motors in a water park plant room
The pool and water park plant room at Butlins Skegness needed a new MCCP to run every pump, blower and feature from one place, with a BMS interface for the integrator's controllers. We designed and built it in Stoke-on-Trent.
Read the case study
Confidential London project
Every BMS control panel for a prestigious London building, from one supplier
The full BMS control panel supply package for a high-profile London building: every outstation and motor control panel across its plant rooms, designed, built and tested in Stoke-on-Trent and delivered to the contractor's programme. The client and project cannot be named.
Read the case study
SSE Energy Solutions
A Form 2 outdoor BMS panel on the roof in 12 working days
SSE Energy Solutions were refitting the third floor of Highgate Mental Health Hospital in London: new walls, heating, HVAC, electrical and controls throughout, with a new BMS tying into the trust's existing Trend network. The panel for it had to sit on the roof, and the only crane was coming down in three weeks.
Read the case studyGot a project, or just need a quick answer?
Tell us what the panel has to do and we will come back with a price and a lead time. Existing accounts: reorders and spares go through the same form.