Water and wastewater · Pump service contractor, West Sussex

Three Telemetrix panels for West Sussex County Council's landfill pumping stations

The contractor look after the pumping infrastructure at West Sussex County Council's landfill sites under a long-term asset management contract. They fitted three wastewater high-level Telemetrix panels so the council gets live status and alerts, and maintenance can be preventative rather than reactive.

Customer
Pump service contractor
End client
West Sussex County Council
Panels
3 x Telemetrix, high level
Sites
Landfill pumping stations

The challenge

Closed landfill pumping stations visited on a schedule rather than daily, for a client that wants problems caught before they become spills.

What we supplied

Three Telemetrix wastewater panels, the same specification at each station, with the high level alarm and remote monitoring built in.

The result

Live status and alerts on all three stations, feeding preventative maintenance for the council.

The requirement

Reliable pumping at closed landfill sites that are visited on a schedule, not daily, for a public sector client that wants problems caught before they become spills. The panels had to give the contractor and the council warning of a high level or a pump trip without an ongoing monitoring subscription.

The constraints

  • Remote sites: nobody on hand to notice a beacon, so the alert has to reach a phone.
  • A public sector client under a long-term asset management strategy: documented, repeatable panels rather than one-offs.
  • Three stations to install and commission alongside the week's routine work.

What we built

Three Telemetrix wastewater panels from the standard range, each with the high level alarm and remote monitoring built in: pump trip, high level and panel offline alerts by email and text to the contractor's team, connected over 4G or the site network. Same panel at each station, so the engineers and the council's records see one thing three times.

Delivery

Supplied from the Telemetrix range and installed and commissioned by the contractor's engineers within the week, alongside the induction of a new pump engineer on his first project.

The outcome

Real-time monitoring and alerts on all three stations, feeding the contractor's preventative maintenance for the council. In the contractor's words, the installation helps ensure "reliable waste management, sustainability and continued operational resilience" for the council's landfill sites.

Got a similar job?

Send the spec, points list or drawing and we will tell you what we would build, the price and the date.

“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”

Pump installer, on the Basix range
  • Wiring diagram, test certificate and 12-month warranty with every panel
  • Built to BS EN 61439-2 and BS EN 60204-1 in Stoke-on-Trent
  • We reply during working hours, usually the same working day

Request a quote

Or call 01782 280577

What happens next. A price and lead time, usually the same working day. Stock panels ship next day. We reply during working hours, Monday to Friday, 7am to 5pm.

Your details go to our sales team by email and are used only to answer this enquiry. No mailing list, nothing shared. Privacy policy.

Got a project, or just need a quick answer?

Tell us what the panel has to do and we will come back with a price and a lead time. Existing accounts: reorders and spares go through the same form.