What we built, and what it had to do
Each one covers the brief, what made it hard, the panel we built and what happened on site. Some customers are named with their permission; the rest are described by what they do and roughly where.
More about BMS control panels →

Butlins Skegness
One MCCP for 64 motors in a water park plant room
The pool and water park plant room at Butlins Skegness needed a new MCCP to run every pump, blower and feature from one place, with a BMS interface for the integrator's controllers. We designed and built it in Stoke-on-Trent.
Read the case study
Confidential London project
Every BMS control panel for a prestigious London building, from one supplier
The full BMS control panel supply package for a high-profile London building: every outstation and motor control panel across its plant rooms, designed, built and tested in Stoke-on-Trent and delivered to the contractor's programme. The client and project cannot be named.
Read the case study
SSE Energy Solutions
A Form 2 outdoor BMS panel on the roof in 12 working days
SSE Energy Solutions were refitting the third floor of Highgate Mental Health Hospital in London: new walls, heating, HVAC, electrical and controls throughout, with a new BMS tying into the trust's existing Trend network. The panel for it had to sit on the roof, and the only crane was coming down in three weeks.
Read the case studyIn their words
“It's everything you'd expect from a G&G panel. It's simple to install and easy to use. I really like the standard in-built light. It's reliable and versatile. When clients want panels on site quick, it's perfect. In short I think it's going to be a game-changer for people in the pump industry.”
“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”
“The panel is very, very decent. Highly rated so far in terms of installation and setting up.”
“Normally we'd expect a 6 to 8 week lead time on a panel build. In this case it was done in 12 working days, which is a testament to G&G Controls and SSE working together.”