Water and wastewater · Pump specialist, Oxfordshire
A star/delta Telemetrix panel, turned round quickly for an Oxford campus
A pumping station on a university campus in Oxford needed its control panel replaced, along with the pump and the float switches. The pump specialist specified a bespoke star/delta Telemetrix panel with remote monitoring, and the whole job, panel, floats and a new 6kW Sulzer pump, was done in a morning.
- Customer
- Pump specialist
- Site
- University campus, Oxford
- Panel
- Star/delta Telemetrix
- Also fitted
- 6kW Sulzer pump, new floats
The challenge
Replace an end-of-life panel on a live campus, for a pump too large for the direct-on-line starter the standard range uses.
What we supplied
A bespoke Telemetrix panel with star/delta starting and remote monitoring, plus new float switches.
The result
Turned round quickly to the pump specialist's specification, with alerts for pump trip, high level and panel offline.
The requirement
Replace an end-of-life pump control panel on a live campus with one that includes remote monitoring, for a pump large enough to need star/delta starting rather than the direct-on-line starter the standard Telemetrix panel is built with.
The constraints
- Star/delta starting for a 6kW Sulzer pump, so a bespoke build on the Telemetrix platform rather than a stock panel.
- The panel, the pump and the floats all changed in one visit, on a working campus.
- The contractor needed the panel quickly to hold the programme.
What we built
A bespoke Telemetrix panel with star/delta starting, remote monitoring and alerts for pump trip, high level and panel offline, built in Stoke-on-Trent to the pump specialist's specification. New float switches on a stainless steel bracket and the replacement pump completed the station.
Delivery
Built to order and turned round to suit the contractor's date.
The outcome
Old panel out, new panel in, floats and pump replaced, remote monitoring live: a morning's work for two engineers. Jamie Allen, Operations Director at the pump specialist: "A massive thank you to G&G Controls for the efficient turnaround of this bespoke star/delta Telemetrix control panel."
Photos
Got a similar job?
Send the spec, points list or drawing and we will tell you what we would build, the price and the date.
“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”
- Wiring diagram, test certificate and 12-month warranty with every panel
- Built to BS EN 61439-2 and BS EN 60204-1 in Stoke-on-Trent
- We reply during working hours, usually the same working day
More case studies

Butlins Skegness
One motor control centre for 64 motors in a water park plant room
The pool and water park plant room at Butlins Skegness needed a new motor control centre to run every pump, blower and feature from one place, with a BMS interface for the integrator's controllers. We designed and built it in Stoke-on-Trent.
Read the case study
Confidential London project
Every BMS control panel for a prestigious London building, from one supplier
The full BMS control panel supply package for a high-profile London building: every outstation and motor control panel across its plant rooms, designed, built and tested in Stoke-on-Trent and delivered to the contractor's programme. The client and project cannot be named.
Read the case study
SSE Energy Solutions
A Form 2 outdoor BMS panel on the roof in 12 working days
SSE Energy Solutions were refitting the third floor of Highgate Mental Health Hospital in London: new walls, heating, HVAC, electrical and controls throughout, with a new BMS tying into the trust's existing Trend network. The panel for it had to sit on the roof, and the only crane was coming down in three weeks.
Read the case studyGot a project, or just need a quick answer?
Tell us what the panel has to do and we will come back with a price and a lead time. Existing accounts: reorders and spares go through the same form.