
Made by G&G Controls in Stoke-on-Trent
Basix WD218S-H 400V star-delta 2-pump wastewater control panel, 12-18A
- Panel code
- WD218S-H
£2,701.46 inc VAT
£2,251.22 ex VAT
£2,251.22 ex VAT
£2,701.46 inc VAT
Built to order, 2–3 weeks
Delivery to UK mainland: small parcel £11.50 + VAT, or collect free from Stoke-on-Trent.
Checkout is coming soon: send your basket and we confirm price, stock and delivery the same working day.
About this panel
Basix wastewater control panel for 2 pumps, three phase with star/delta start. Motor overloads 12-18A. Steel enclosure. With hours run. Made by G&G Controls in Stoke-on-Trent to code WD218S-H.
What the code means
Each part of WD218S-H says how the panel is built.
| Code | Meaning |
|---|---|
| W | Application: Wastewater |
| D | Supply: Three phase with Star/delta start |
| 2 | Pumps: 2 |
| 18 | Motor overloads: 12-18A |
| S | Enclosure: Steel |
| H | Extra: Hours run |
Similar items

Basix WD206S-AHP 400V star-delta 2-pump wastewater control panel, 4-6A
G&G Controls · WD206S-AHP
£2,696.72 inc VAT
£2,247.27 ex VAT
£2,247.27 ex VAT
£2,696.72 inc VAT
Built to order, 2–3 weeks
- Photo to follow
Basix WD206L-C 400V star-delta 2-pump wastewater control panel, 4-6A
G&G Controls · WD206L-C
£2,735.48 inc VAT
£2,279.57 ex VAT
£2,279.57 ex VAT
£2,735.48 inc VAT
Built to order, 2–3 weeks

Basix WD213G 400V star-delta 2-pump wastewater control panel, 9-13A
G&G Controls · WD213G
£2,735.48 inc VAT
£2,279.57 ex VAT
£2,279.57 ex VAT
£2,735.48 inc VAT
Built to order, 2–3 weeks

Basix WE206S-LT 400V star-delta 2-pump wastewater control panel, 4-6A
G&G Controls · WE206S-LT
£2,756.96 inc VAT
£2,297.47 ex VAT
£2,297.47 ex VAT
£2,756.96 inc VAT
Built to order, 2–3 weeks

Basix WR210S-A 230V 2-pump wastewater control panel, 7-10A
G&G Controls · WR210S-A
£2,643.83 inc VAT
£2,203.19 ex VAT
£2,203.19 ex VAT
£2,643.83 inc VAT
Built to order, 2–3 weeks

Basix WE210S-Q 400V star-delta 2-pump wastewater control panel, 7-10A
G&G Controls · WE210S-Q
£2,776.19 inc VAT
£2,313.49 ex VAT
£2,313.49 ex VAT
£2,776.19 inc VAT
Built to order, 2–3 weeks
