
Made by G&G Controls in Stoke-on-Trent
Basix WE224S-J 400V star-delta 2-pump wastewater control panel, 16-24A
- Panel code
- WE224S-J
£3,119.70 inc VAT
£2,599.75 ex VAT
£2,599.75 ex VAT
£3,119.70 inc VAT
Built to order, 2–3 weeks
Delivery to UK mainland: small parcel £11.50 + VAT, or collect free from Stoke-on-Trent.
Checkout is coming soon: send your basket and we confirm price, stock and delivery the same working day.
About this panel
Basix wastewater control panel for 2 pumps, three phase star/delta with neutral. Motor overloads 16-24A. Steel enclosure. With generator inlet. Made by G&G Controls in Stoke-on-Trent to code WE224S-J.
What the code means
Each part of WE224S-J says how the panel is built.
| Code | Meaning |
|---|---|
| W | Application: Wastewater |
| E | Supply: Three phase star/delta with neutral |
| 2 | Pumps: 2 |
| 24 | Motor overloads: 16-24A |
| S | Enclosure: Steel |
| J | Extra: Generator inlet |
Similar items

Basix WD224S-3JSV 400V star-delta 2-pump wastewater control panel, 16-24A
G&G Controls · WD224S-3JSV
£3,140.87 inc VAT
£2,617.39 ex VAT
£2,617.39 ex VAT
£3,140.87 inc VAT
Built to order, 2–3 weeks

Basix WE210S-QX 400V star-delta 2-pump wastewater control panel, 7-10A
G&G Controls · WE210S-QX
£3,145.75 inc VAT
£2,621.46 ex VAT
£2,621.46 ex VAT
£3,145.75 inc VAT
Built to order, 2–3 weeks

Basix WE218S-Q 400V star-delta 2-pump wastewater control panel, 12-18A
G&G Controls · WE218S-Q
£3,067.86 inc VAT
£2,556.55 ex VAT
£2,556.55 ex VAT
£3,067.86 inc VAT
Built to order, 2–3 weeks

Basix WT306S-AH 400V 3-pump wastewater control panel, 4-6A
G&G Controls · WT306S-AH
£3,056.66 inc VAT
£2,547.22 ex VAT
£2,547.22 ex VAT
£3,056.66 inc VAT
Built to order, 2–3 weeks

Basix WT104S-M 400V 1-pump wastewater control panel, 2.5-4A
G&G Controls · WT104S-M
£3,189.73 inc VAT
£2,658.11 ex VAT
£2,658.11 ex VAT
£3,189.73 inc VAT
Built to order, 2–3 weeks

Basix WT113S-M 400V 1-pump wastewater control panel, 9-13A
G&G Controls · WT113S-M
£3,189.73 inc VAT
£2,658.11 ex VAT
£2,658.11 ex VAT
£3,189.73 inc VAT
Built to order, 2–3 weeks
