
Made by G&G Controls in Stoke-on-Trent
Basix WW104S-U 400V 1-pump wastewater control panel, 2.5-4A
- Panel code
- WW104S-U
£5,121.76 inc VAT
£4,268.13 ex VAT
£4,268.13 ex VAT
£5,121.76 inc VAT
Built to order, 2–3 weeks
Delivery to UK mainland: small parcel £11.50 + VAT, or collect free from Stoke-on-Trent.
Checkout is coming soon: send your basket and we confirm price, stock and delivery the same working day.
About this panel
Basix wastewater control panel for one pump, three phase with neutral. Motor overloads 2.5-4A. Steel enclosure. With pulsar Ultrasonic level controls. Made by G&G Controls in Stoke-on-Trent to code WW104S-U.
What the code means
Each part of WW104S-U says how the panel is built.
| Code | Meaning |
|---|---|
| W | Application: Wastewater |
| W | Supply: Three phase with neutral |
| 1 | Pumps: 1 |
| 04 | Motor overloads: 2.5-4A |
| S | Enclosure: Steel |
| U | Extra: Pulsar Ultrasonic level controls |
Similar items

Basix WE224S-CGS 400V star-delta 2-pump wastewater control panel, 16-24A
G&G Controls · WE224S-CGS
£5,148.90 inc VAT
£4,290.75 ex VAT
£4,290.75 ex VAT
£5,148.90 inc VAT
Built to order, 2–3 weeks

Basix WS124S-U 230V 1-pump wastewater control panel, 16-24A
G&G Controls · WS124S-U
£5,174.10 inc VAT
£4,311.75 ex VAT
£4,311.75 ex VAT
£5,174.10 inc VAT
Built to order, 2–3 weeks

Basix WT206S-GY 400V 2-pump wastewater control panel, 4-6A
G&G Controls · WT206S-GY
£5,031.64 inc VAT
£4,193.03 ex VAT
£4,193.03 ex VAT
£5,031.64 inc VAT
Built to order, 2–3 weeks

Basix WI2022S-SV 400V inverter 2-pump wastewater control panel, 2.2kW
G&G Controls · WI2022S-SV
£5,019.24 inc VAT
£4,182.70 ex VAT
£4,182.70 ex VAT
£5,019.24 inc VAT
Built to order, 2–3 weeks

Basix WW310S-AGP 400V 3-pump wastewater control panel, 7-10A
G&G Controls · WW310S-AGP
£5,231.93 inc VAT
£4,359.94 ex VAT
£4,359.94 ex VAT
£5,231.93 inc VAT
Built to order, 2–3 weeks

Basix WI2022S 400V inverter 2-pump wastewater control panel, 2.2kW
G&G Controls · WI2022S
£4,998.07 inc VAT
£4,165.06 ex VAT
£4,165.06 ex VAT
£4,998.07 inc VAT
Built to order, 2–3 weeks
