Data centre cooling for Vera Rubin, Nvidia's new CPU and GPU platform

By Tristan Newton, Commercial Director · 27 March 2026 · 4 min read

NVIDIA’s Vera Rubin platform shifts data centre cooling toward high‑temperature, fully liquid systems that can often run without traditional chillers, using warm‑water direct‑to‑chip loops and dry (or hybrid) coolers instead of big mechanical plants. And when we say warm water, we mean 45 °C flow, 65 °C return. As anyone in the HVAC game knows, that's wild - suddenly it becomes a whole bunch easier to cool (you can achieve 65 > 45 °C pretty easily with free cooling), and at the same you could have an entire district heating circuit straight off the other side of it. It looks likely to be a game changer in data centre energy efficiency.

NVIDIA CEO Jensen Huang holding the Vera Rubin

NVIDIA CEO Jensen Huang holding the Vera Rubin

Key thermal characteristics

  • The liquid loop is 100% responsible for removing IT heat; forced air is now mainly for secondary components and room mixing, not primary chip cooling.
  • Coolant supply is around 45 °C with return temperatures up to about 65 °C, so the system operates as “warm water” single‑phase direct liquid cooling (DLC).
  • To compensate for tighter temperature differentials at these higher setpoints, Rubin increases liquid flow rates to achieve almost double the effective rack‑level thermal performance vs Blackwell.​

Rack and loop-level cooling

At rack level, Rubin servers use cold plates or embedded liquid modules on GPUs, CPUs and high‑power networking, plumbed into a closed liquid loop inside the rack (NVL72 and similar trays). Warm water enters at about 45 °C, passes through the cold plates, and exits around 55–65 °C depending on design delta‑T and flow. This loop connects to a CDU (cooling distribution unit) or manifold that interfaces with the facility’s secondary water loop at similar temperatures and pressures aligned with OCP MGX specifications (up to 5 Bar operating pressure).

Because the rack is fully liquid‑cooled, power densities per rack are expected to exceed 200 kW and push toward 600 kW in future Rubin deployments, far beyond what any practical air‑only system can support. This concentration of heat makes leak detection, materials compatibility, and redundant pumping within each loop critical design elements, but it also means much less heat is dumped into the white space air volume.

Facility-side cooling and “no chillers”

Vera Rubin’s big claim is that at a 45 °C supply temperature you can reject heat using ambient air in many climates, without mechanical chillers. In moderate regions (for example, North Virginia or New Jersey), analysts estimate that raising the water temperature window by ~10 °C can cut spend on heat‑rejection components by roughly one‑third, because dry coolers and simple fluid coolers can run in “free cooling” mode more of the year.

In practice, facility cooling for Rubin looks like this in cooler climates:

  • Warm‑water secondary loop from the racks to outdoor dry coolers or hybrid coolers.
  • Little or no compressor‑based chilling except for rare hot‑day conditions, redundancy, or mixed‑load halls.
  • Much lower dependence on evaporative cooling, which reduces site potable water use and alleviates local sustainability concerns.

However, in hotter markets (e.g. Mumbai, Melbourne design days), the ambient wet‑bulb and dry‑bulb temperatures can get close to or above the 45 °C inlet requirement once you include approach temperatures and pump/heat‑exchanger losses. In those locations, engineers expect that at least some mechanical chilling will still be required at peak conditions, meaning Rubin reduces chiller hours rather than eliminating chillers entirely.

Example table: cooling stack vs older AI racks

Aspect Grace Blackwell era Vera Rubin era
Typical rack power ~120–130 kW per high‑end rack​ >200 kW, roadmap toward ~600 kW racks
Primary chip cooling Mix of air + DLC/immersion​ Fully direct liquid to chip
Supply water temp ~35 °C–40 °C typical 45 °C warm water standard
Return water ceiling ~60–65 °C​ Up to ~65 °C expected​
Facility heat rejection Chillers + evap + some dry​ Dry/hybrid coolers dominant in many sites
Chiller dependence High Reduced or zero in mild climates

Impact on data centre design

Rubin‑class loads force a shift from legacy 5–15 kW air‑cooled racks to purpose‑built “AI halls” or retrofitted spaces with liquid distribution, CDUs, and much higher rack densities. Existing sites will often add manifolded warm‑water loops, isolate Rubin pods with tailored heat‑rejection gear, and leave the traditional chilled‑water CRAH/CRAC systems to support the rest of the IT load.

Hyperscalers are already using digital‑twin tools (for example, Omniverse‑based DC design) to model chip‑to‑campus thermals, pump energy, and free‑cooling hours before deploying Rubin at scale. Analysts expect the combination of high‑temperature DLC and simplified plant to cut overall facility cooling power by on the order of 30–40% in favourable climates, significantly improving PUE for AI‑heavy sites.

Written by the engineers at G&G Controls, a UK control panel manufacturer in Stoke-on-Trent. For general guidance only; consult a qualified professional for advice on your own installation.

Up next

Analogue vs. Digital Signals

In modern building services and control systems, you'll encounter two fundamental types of signals: analogue and digital.

Related panel

If this article is about a problem you have on site, this is the panel we would suggest.

Evometrix BMS control panel internals

Standardised BMS control panel

Evometrix

Pre-designed, pre-drawn and refined over many builds. Drawings in two working days, delivery in 10 to 20 working days, and half the programming time on site.

Fixed price per panel.

Ask an engineer

A question about this article or a panel for your site. We reply during working hours.

Or call 01782 280577

What happens next. Drawings from a points list in 2 working days. Evometrix panels in 10 to 20 working days. We reply during working hours, Monday to Friday, 7am to 4.30pm.

Your details go to our sales team by email and are used only to answer this enquiry. No mailing list, nothing shared. Privacy policy.

More on bms

Free-issue controllers: how it works and what we need from you

Free-issue controllers: how it works and what we need from you

Sending your own Trend, Distech, ISMA or Tridium controllers to be fitted into a panel: what to send, when, how it is labelled and tested, and who is responsible for what.

14 August 2026 · 4 min read

What's inside a BMS outstation panel

What's inside a BMS outstation panel

Power supplies, surge protection, a network switch, the controller and the terminals: what each part of a BMS panel does, and why the bits around the controller matter as much as the controller.

7 August 2026 · 4 min read

How to write a BMS points list that gets an accurate quote

How to write a BMS points list that gets an accurate quote

A points list is the one document that turns a BMS panel enquiry into a price and a drawing. What to put in it, what to leave out, and a template to start from.

31 July 2026 · 4 min read

Latest from the knowledge hub

Standardising a control panel platform: how OEMs take cost and lead time out
Company and industry

Standardising a control panel platform: how OEMs take cost and lead time out

Equipment makers who order panels every month usually order too many variants. How to design one platform with option blocks, what it saves, and how to move a range across to it.

21 August 2026 · 4 min read

Telemetry costs explained: SIM, data, texts and the Dashboard
Wastewater practice

Telemetry costs explained: SIM, data, texts and the Dashboard

No subscription for alerts, so what do you actually pay to monitor a pump station remotely? Every cost of a Telemetrix panel, with worked examples for one station and for fifty.

24 July 2026 · 4 min read

Adoptable pumping station control panels: what the water companies require
Wastewater practice

Adoptable pumping station control panels: what the water companies require

How a panel for an adoptable sewage pumping station differs from a standard one, what United Utilities, Severn Trent, Anglian Water and the other authorities look for, and how to avoid a failed handover.

17 July 2026 · 4 min read

All 66 articles →